Friday, March 29, 2013

Meeting Notes 3.29.13


Old Todo


  • Idea Wrap drink lines around co2 container for cooling
  • Will the CO2 tank use up all the drink?
  • Do we have enough pressure to move the solenoid
    • Note: This is not a gravity-feed solenoid. This means that you will need enough water pressure to fully open the valve. Check the datasheet below for exact details. It operates at a minimum of around 3 PSI, allowing around 3 L/min of flow. Although the datasheet shows the valve working at 220 VAC, it's actually 12 VDC. Our 350 GPH pump does not have enough pressure for this valve. A garden hose or other pressurized system should work just fine.
  • Upcoming DeadLines
    • We are behind schedule but will make it up
    • Still Behind due to slow part orders
  • Part Ordering
    • McMaster Parts (Jordan)
      • done
    • Robot Market Place (David)
      • Battery Done
    • Northern Tool (Jordan)
      • Wheels Shipped
    • Amazon (Jordan)
      • HP Touch pad (Done)
  • RCOS Presentation
    • intro slide (Jordan)
    • Chassis (Kyle)
    • H-Bridge (David)
    • UI (Bhrath)
    • Future(Jordan)
    • Questions(all)
      • Presentation went great Not to follow through with work

New Todo

  • Update GIT Hub (Software Team)
  • Orders
    • Orders
      • Other Wheel (Jordan)
        • Shipping
      • Tube (Jordan)
        • Shipping
      • Solenoid Adaptors (Jordan)
        • Order
      • Keystock (David)
        • PO turned in
      • I/O I/O (David)
        • PO turned in
      • Battery (David)
        • PO turned in
      • More Metal (David)
        • Home Depot Run (on Monday)
        • Will happen on Friday
  • Finish Chassis
    • Add Wheels and Motors (Kyle)
    • Add Electronic Board (Andre + David)
    • Water Jet Order (Jordan)
      • Waiting to see how to cut it down to fit on water jet
    • Add Tablet (Kyle or Jordan)
  • Continue Wiring (David + Andre)
  • Sensor Array (TBD)


No comments:

Post a Comment